Energy

Electrical Commissioning Technician

  • No Reviews

  • 0 Order in queue

  • 841 Views

  • Response Time 1 Hour

Description

  • Clearing of all electrical & instrument punch lists for system and sub-systems.
  • Verified pre-com and checked tag numbers & other data are securely attached to each device.
  • Modification of fire water pump panel.
  • Inspection and testing of all pumps and motor.
  • Maintained commissioning discipline documentation and good understanding of PTW SYSTEM for the isolation and de-isolation (Lock/out Tag/Lock) prior for commissioning standard procedure.
  • Close punch list items, fill out check sheets, and handle direct preparation of drawings.
  • Attended safety tool box meeting daily to ensure all documents are correct and tasks at hand are “SAFE”.
  • Performed line checking of E/I cable at junction box to marshaling and DCS room.
  • Pre-commissioning and performed line checked grounding resistance, isolation resistance, meggering, conductivity, and Polarization of various electrical & instrument wire/cable for functional test of control circuit prior safety standard procedures.
  • Monitoring of a normalized live panel in the switchgear during changed my schedule on nightshift.
  • Housekeeping of my work area, after finished my job.

About The Seller

  • Location:

    Philippines
  • Member since:

    27.07.22
14198
Starting From
150
Service charges 3€

Ref #: 14198